jelikofer@tri-statesystems.com
Call us Today (812) 425-2233
Tri-State SystemsTri-State Systems
  • High Density Shelving
    • Electrical Mobile Storage
    • Mechanical Mobile Storage
    • Modular Mobile Storage
    • Lateral Mobile Storage
    • Static High-Density Storage
    • High-Bay Archival Shelving
    • Wide Span Archival Shelving
    • Office File Cabinets
    • Mezzanine Solutions
    • Weapons Storage
  • Supplies
    • File Folders
    • Labels
  • Electronic Records Management
    • Physical File Tracking SW
    • Records Management SW
    • Legal Hold SW
  • Services
    • Consulting
    • Relocation
    • Purges
    • Imaging Services
    • Centralizing
    • Outsourcing
  • Resources
    • Recent Work
    • Tool Kits
    • Literature
  • Contact Us
  • Request Quote
Crane Naval Base
  • High Density Shelving
    • Electrical Mobile Storage
    • Mechanical Mobile Storage
    • Modular Mobile Storage
    • Lateral Mobile Storage
    • Static High-Density Storage
    • High-Bay Archival Shelving
    • Wide Span Archival Shelving
    • Office File Cabinets
    • Mezzanine Solutions
    • Weapons Storage
  • Supplies
    • File Folders
    • Labels
  • Electronic Records Management
    • Physical File Tracking SW
    • Records Management SW
    • Legal Hold SW
  • Services
    • Consulting
    • Relocation
    • Purges
    • Imaging Services
    • Centralizing
    • Outsourcing
  • Resources
    • Recent Work
    • Tool Kits
    • Literature
  • Contact Us
  • Request Quote

Crane Naval Base

 

Tri-State Systems, Inc. recently completed a multi-phase relocation and installation of radio and communication equipment storage for the U.S. Navy.

Phase 1 involved removing the existing mobile shelving system for relocation to a new room, disposing of old flooring and decking materials, and grinding down exposed concrete anchors.

Phase 2 focused on building a new mobile system in a different room. Tracks were placed, leveled, and anchored, followed by the use of non-shrinking grout to support the tracks and decking. A new floor base was installed using OSB plywood, and grey vinyl flooring tiles were added to create a clean, finished surface.

Phase 3 included moving shelving materials into the new space and completing system assembly. A stationary unit was cut to size to maximize storage capacity while accommodating overhead piping.

Copyright © 2026 Tri-State Systems